Line 27 was replaced by lines 27-32 |
- * The magnet seems not to work reliably with the lambda stage |
+ * The magnet has a cold leak, occuring only occasionaly at low temperatures. |
+ As a workaround the main vacuum has to be pumped constantly. (Oct 2006) |
+ |
+ ! Solved issues |
+ |
+ * The magnet seemed not to work reliably with the lambda stage |
Lines 37-41 were replaced by lines 42-43 |
- |
- * The magnet has a cold leak, occuring only occasionaly at low temperatures. |
- As a workaround the main vacuum has to be pumped constantly. (Oct 2006) |
- |
- ! Solved issues |
+ We now believe that during the quench, the magnet was too close to the |
+ magnetic beam dump. |