PreparingDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


This is version 6. It is not the current version, and thus it cannot be edited.
[Back to current version]   [Restore this version]


Preparing the Kelvinox Dilution and Gas Handling System

  • pump the traps (heat out each for 30 min, but pump longer)
  • pump out the condenser and pumping line, on the gas handling system and on the stick (all volumes might be connected)

After some hours (or one night)

  • make the seal with clean fingers (a thick layer on the stick, only a small amount inside the aluminium tube)
  • put the tube, turning it a little on the seal and start pumping with the leak detector.
  • leak check
  • put into LN2 for precooling, put a small amount of He (1 mbar or less) into the IVC.
  • if there is no hurry and the sample must be cooled slowly, the stick might be put directly into the cryostat (without LN2 precooling).

  • cool down the heat exchanger of the variox or magnet (setpoint 5 K)
  • pump the IVC (15 min. with sorb temperature set to 40 K, then 1 h without sorb heater)
  • test if the temperature of the mixing chamber is no longer coupled to the heat exchanger (changing the setpoint to 6 or 7 K).

  • if not yet done, take the special assembly to connect the pumping line and the condenser line with the stick
  • pump out the adapter piece