PreparingDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


Preparing the Kelvinox Dilution and Gas Handling System

  • pump the traps (heat out each for 30 min, but pump longer)
  • pump out the condenser and pumping line, on the gas handling system and on the stick (all volumes might be connected)

After some hours (or one night)

  • make the CAF seal (red silicon paste) with clean fingers
  • put the tube, turning it a little on the seal and start pumping with the leak detector.
  • leak check
  • put the stick into the Variox or magnet VTI.
  • insert about 50 mbar 4He into the IVC
  • take the special assembly to connect the pumping line and the condenser line with the stick
  • pump out the adapter piece
  • connect a turbo pump to the IVC, start te pump, but do not yet open the IVC valve.

The following steps can be done automatically in SEA, under "main diltuion control"

  • ("cool") cool down the heat exchanger of the variox or magnet
  • When the stick is cold (< 4K, ins SEA "readyforpump") pump the IVC by clicking on "sorbpump" and opening the IVC valve, which is already connected to a running turbo pump. This heats up the VTI to 5 K, which might take a while. After 20 min. with sorb temperature set to 40 K, then 15 min without sorb heater, the "condense" step starts automatically.



Printer Friendly  Page Info
This page last changed on 25-Aug-2015 07:45:33 UTC by MarkusZolliker.