PreparingDIL
Preparing the Kelvinox Dilution and Gas Handling System
- pump the traps (heat out each for 30 min, but pump longer)
- pump out the condenser and pumping line, on the gas handling
system and on the stick (all volumes might be connected)
After some hours (or one night)
- make the CAF seal (red silicon paste) with clean fingers
- put the tube, turning it a little on the seal and start pumping
with the leak detector.
- leak check
- put the stick into the Variox or magnet VTI.
- insert about 50 mbar 4He into the IVC
- take the special assembly to connect the pumping
line and the condenser line with the stick
- pump out the adapter piece
- connect a turbo pump to the IVC, start te pump, but do not yet open the IVC valve.
The following steps can be done automatically in SEA, under "main diltuion control"
- ("cool") cool down the heat exchanger of the variox or magnet
- When the stick is cold (< 4K, ins SEA "readyforpump") pump the IVC by clicking on "sorbpump" and opening
the IVC valve, which is already connected to a running turbo pump.
This heats up the VTI to 5 K, which might take a while. After 20 min. with sorb temperature set to 40 K,
then 15 min without sorb heater, the "condense" step starts automatically.