PreparingDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


This is version 11. It is not the current version, and thus it cannot be edited.
[Back to current version]   [Restore this version]


Preparing the Kelvinox Dilution and Gas Handling System

  • pump the traps (heat out each for 30 min, but pump longer)
  • pump out the condenser and pumping line, on the gas handling system and on the stick (all volumes might be connected)

After some hours (or one night)

  • make the CAF seal (red silicon paste) with clean fingers
  • put the tube, turning it a little on the seal and start pumping with the leak detector.
  • leak check
  • put the stick into the Variox or magnet VTI.
  • insert about 50 mbar 4He into the IVC

  • cool down the heat exchanger of the variox or magnet
  • pump the IVC (5 min. with sorb temperature set to 40 K, then 1 h without sorb heater)

  • if not yet done, take the special assembly to connect the pumping line and the condenser line with the stick
  • pump out the adapter piece for 15 min


This particular version was published on 25-Aug-2015 07:37:15 UTC by MarkusZolliker.