This is version 11.
It is not the current version, and thus it cannot be edited.
[Back to current version]
[Restore this version]
Preparing the Kelvinox Dilution and Gas Handling System
- pump the traps (heat out each for 30 min, but pump longer)
- pump out the condenser and pumping line, on the gas handling
system and on the stick (all volumes might be connected)
After some hours (or one night)
- make the CAF seal (red silicon paste) with clean fingers
- put the tube, turning it a little on the seal and start pumping
with the leak detector.
- leak check
- put the stick into the Variox or magnet VTI.
- insert about 50 mbar 4He into the IVC
- cool down the heat exchanger of the variox or magnet
- pump the IVC (5 min. with sorb temperature set to 40 K,
then 1 h without sorb heater)
- if not yet done, take the special assembly to connect the pumping
line and the condenser line with the stick
- pump out the adapter piece for 15 min
This particular version was published on 25-Aug-2015 07:37:15 UTC by MarkusZolliker.
|