CryogenicHandling

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
HeCryostats

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


This is version 14. It is not the current version, and thus it cannot be edited.
[Back to current version]   [Restore this version]


Cryogenic Handling

General Remarks

Handling cryogenic liquids should only be done by trained people. Fear is a bad teacher
and you should always consult a more experienced instrument scientist or the sample environment team
if you are in doubt how to handle things correctly.
Please always keep in mind that you are working with boiling liquids which will evaporate rather quickly when exposed to ambient temperatures.
Think about the consequences of your doing before you do it (e.g. what will happen if you open a specific valve).

For information on how to set up an orange cryostat and how to change samples, please follow this link: OrangeCryostat.

Liquid Nitrogen

Most of our cryostats and cryo-magnets have an outer liquid nitrogen jacket to reduce the heat load on the helium bath.
The storage dewars are prepared by the sample environment staff and can be picked up at the preparation area (between FOCUS and MARS).
The dewars provided are self pressurizing systems with a mechanical level indicator at the top as shown below.
LN2_dewar_schematics

The dewars are always pressurized.

  • Ensure that the hose is firmly connected to the vessel and the nozzle is not pointing towards a person before opening the valve.
The filling hoses have a metallic protection sleeve. The valves and the hose get very cold during a nitrogen transfer.
  • Make sure that you wear protective leather gloves when handling cold parts.

When using the automatic nitrogen refill

  • test the automatic to assure that the filling hose remains in the cryostat filling port and that the system switches off correctly

Liquid Helium

Liquid Helium dewars are provided by the sample environment staff at the sample preparation area.
At PSI we run a Helium recovery system.

  • Please make sure that the dewars are always connected to the recovery line when not in use
  • Remember to close the valve on the recovery line when taking a dewar away and to open it after return
  • Always measure the Helium level in the dewar before you take a Dewar away
  • When using the crane be aware that no equipment (or dewar) should be moved over the DMC detector

LHe_dewar

Helium Transfer:

  • Before you open the extraction port you should release the pressure in the dewar which might have built up during transport by opening one of the release valves
  • Insert the Helium siphon first into the transport dewar.
  • close all manual pressure release valves
  • slowly lower the siphon into the dewar observe the pressure rise in the dewar (try to stay below 0.2bar)
  • you should see gas streaming out on the other end of the siphon
  • don't put your hands in the gas stream
  • when it starts to turn white you can insert this end into the cryostat Helium filling port
  • continue to lower the siphon into the transport dewar until you reach the bottom and lift it up by 10 cm
  • switch on the compressed Helium gas line and connect the gas hose to one of the pressure release valves
and open it. The dewar is now pressurized to 0.2bar over pressure. When the transfer is finished:
  • stop the pressure line
  • release the dewar pressure before you remove the siphon.
  • make sure that the extraction and filling ports are properly sealed

He_gas_line



Attachments:  HeDewar.png  gasline.png  CCU.png  transportstraps.png  afterfill.png  cl_clpb.gif  LN2.png  HeDewartransport.png 
This particular version was published on 07-May-2012 14:15:18 UTC by Bartkowiak.