Diff: OrangeCryostatCooldownProcedure

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
HeCryostats

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


Difference between version 22 and version 18:
Line 21 was replaced by line 21
- * Increase the temperature of the heat exchanger to 100 K.
+ * Increase the temperature of the heat exchanger to 100 K. (The better part of air will not condense at this temperature)
Line 25 was replaced by lines 25-27
- * Pump down and flush again with He gas, then pump down to a pressure between 10 and 50 mbar.
+ * Pump down and flush again with He gas. To remove all contaminants you should repeat this procedure an infinite number of times (at least 2x).
+ * If you cannot reach 0 mbar (or -1 bar) on the mechanical gauges you might be faced with a leak into the sample chamber or with an offset on the gauge.
+ * Pump down to a pressure between 10 and 50 mbar.
Line 69 was replaced by line 71
- The CCU will only work with a correctly configured SEA instance. It can read the pressure in the VTI pumping line and set the needle valve accordingly.\\
+ The CCU will only work with a correctly configured SEA instance. It can read the pressure in the Helium gas pumping line and set the needle valve accordingly.\\

Back to OrangeCryostatCooldownProcedure, or to the Page History.