OrangeCryostatCooldownProcedure


Orange Cryostat Cooldown Procedure

For some general remarks on cryogenic handling at the Neutron guide hall see.

Preparation

This is normally done by a sample environment technician

OrangeCryostatTopPictures

Insert Sample

Cool Down

  1. Connect helium pump to the pumping port (P). Switch on the pump and wait until the pressure stabilizes (should be less than a few millibars). Make sure that the warm valve (W) is closed, open cold valve (C) a little, the pressure at the pump should not exceed 20 mbar (30 on a maxi cryostat). In SEA, this could be done by switching the needle valve control to automatic and set 20 - 30 for the flow maximum.
  2. Put a setpoint of 10 K on the heat exchanger.
  3. When the heat exchanger is at 10 K and the sample near 10 K, reduce the pressure by closing the cold valve gradually until the heating power the temperature controller needs to keep 10 K has reached a value between 100 and 200 mW. With SEA, the regulation of the needle valve is done automatically, but the value for "flow set" should be optimized if not known from an earlier run.
  4. Put the temperature setpoint to zero. The cryostat should cool to 1.6 K within 10 minutes. If the base temperature can not be reached or the "nv_Set" is oscillating, most probably the value for "flow set" was not determined properly, and must be increased slighly.

Cool Down with warm valve

In principle there is the possibility to cool down with the use of the warm valve, without He pump. As this is not recommended, it is mentioned only for information. Make sure that the warm valve is always closed except for preparation.

Remove Sample

He Flow Schematics

OrangeCryostatCooldownProcedure/NeedleValveControl.png

Automatic Cryostat Control and Monitoring

All our cryostats are monitored and controlled with SEA.
All instruments are equipped with a temperature controller (Lakeshore 340) for the temperature control
and a cryostat control unit (CCU) for the control of pressures, levels and valves.
The CCU will only work with a correctly configured SEA instance. It can read the pressure in the Helium gas pumping line and set the needle valve accordingly.
It reads the analog output of AMI Helium level meters and serves as a level indicator for our 2 point liquid Nitrogen level meter.
The Unit is used to energize the electromagnetic valves involved in the automatic Nitrogen/Helium refill.

CCU