RemoveMixtureDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


This is version 4. It is not the current version, and thus it cannot be edited.
[Back to current version]   [Restore this version]


Removing the Mixture

  • close valve 13A, open valves 9 and 3
  • set the mixing chamber heater and the still heater to 20 mW
  • the VTI set temperature can be set to 10 K, as soon as the dump pressure is beyond 90 % of its original value (630 mbar on DIL? 500 mbar on DIL2)
  • wait until the pressure on P1 drops below 0.01 mbar (or 0.1 mbar, if the stick is used again), then close all valves.


This particular version was published on 02-Jul-2007 14:22:28 UTC by MarkusZolliker.