RemoveMixtureDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


Removing the Mixture

It is highly recommended to use the automatic scripts in SEA. You might choose between:

  • remove_only: remove the mixture and stay at 10 K
  • remove_and_warmup: remove and warm up to 80 K for removing the stick
  • remove_and_condense
  • remove_and_sorbump

Manual procedure:

  • close valve 13A, open valves 9 and 3
  • set the mixing chamber heater and the still heater to 19 mW
  • set the VTI temperature to 4 K
  • the VTI set temperature can be set to 10 K, as soon as the dump pressure is beyond 90 % of its original value (630 mbar on DIL1, 500 mbar on DIL2)
  • wait until the pressure on P1 drops below 0.1 mbar, then close all valves, and stop the 3He pump.

DIL1/igh.png


Printer Friendly  Page Info
This page last changed on 25-Aug-2015 09:18:34 UTC by MarkusZolliker.