Lines 5-9 were replaced by lines 5-9 |
- * if the system has to be warmed up to room temperature, the |
- VTI set temperature can be set to 10 K, as soon as the dump |
- pressure is beyond 90 % of its original value (630 mbar) |
- * wait until the pressure on P1 drops below 0.01 mbar, then close |
- valves 12, 13, 3 and 9. |
+ * the VTI set temperature can be set to 10 K, as soon as the dump |
+ pressure is beyond 90 % of its original value (630 mbar on [DIL] |
+ 500 mbar on [DIL2]) |
+ * wait until the pressure on P1 drops below 0.01 mbar (or 0.1 mbar, |
+ if the stick is used again), then close all valves. |