| At line 2 added 10 lines. |
| + It is highly recommended to use the automatic scripts in SEA. |
| + You might choose between: |
| + |
| + * remove_only: remove the mixture and stay at 10 K |
| + * remove_and_warmup: remove and warm up to 80 K for removing the stick |
| + * remove_and_condense |
| + * remove_and_sorbump |
| + |
| + Manual procedure: |
| + |
| Line 4 was replaced by lines 14-15 |
| - * set the mixing chamber heater and the still heater to 20 mW |
| + * set the mixing chamber heater and the still heater to 19 mW |
| + * set the VTI temperature to 4 K |
| Line 6 was replaced by line 17 |
| - pressure is beyond 90 % of its original value (630 mbar on [DIL] |
| + pressure is beyond 90 % of its original value (630 mbar on [DIL1], |
| Lines 8-9 were replaced by lines 19-22 |
| - * wait until the pressure on P1 drops below 0.01 mbar (or 0.1 mbar, |
| - if the stick is used again), then close all valves. |
| + * wait until the pressure on P1 drops below 0.1 mbar, then close |
| + all valves, and stop the 3He pump. |
| + |
| + [DIL1/igh.png] |