At line 2 added 10 lines. |
+ It is highly recommended to use the automatic scripts in SEA. |
+ You might choose between: |
+ |
+ * remove_only: remove the mixture and stay at 10 K |
+ * remove_and_warmup: remove and warm up to 80 K for removing the stick |
+ * remove_and_condense |
+ * remove_and_sorbump |
+ |
+ Manual procedure: |
+ |
Lines 4-9 were replaced by lines 14-22 |
- * set the mixing chamber heater and the still heater to 1 mW |
- * if the system has to be warmed up to romm temperature, the |
- VTI set temperature can be set to 10 K, as soon as the dump |
- pressure is beyond 90 % of its original value (630 mbar) |
- * wait until the pressure on P1 drops below 0.01 mbar, then close |
- valves 12, 13, 3 and 9. |
+ * set the mixing chamber heater and the still heater to 19 mW |
+ * set the VTI temperature to 4 K |
+ * the VTI set temperature can be set to 10 K, as soon as the dump |
+ pressure is beyond 90 % of its original value (630 mbar on [DIL1], |
+ 500 mbar on [DIL2]) |
+ * wait until the pressure on P1 drops below 0.1 mbar, then close |
+ all valves, and stop the 3He pump. |
+ |
+ [DIL1/igh.png] |