Line 33 was replaced by lines 33-36 |
- of equipment has raised severely. |
+ of equipment has raised severely. We suggest to implement a limit for |
+ dilution experiments: The total number of dilution days plus 3 times the |
+ number of experiments should not exceed 125 % of the available SINQ |
+ beam days. |
Removed lines 35-38 |
- ||Period ||SINQ beam days||Dil Expt.||Dil Days||DD||Points||Overbooking |
- |Aug-Dez 2006|98 |15 |88 |15 |133 | 12 % |
- |Apr-Aug 2007|93 |17 |96 |35 |147 | 26 % |
- |
Lines 46-53 were replaced by lines 45-49 |
- |overbooking | o = (p / l - 1) * 100 %| 12 %| 27 % |
- |
- Legend: |
- \\DD Days with both sticks running simultaeously |
- \\Points |
- days beamdays dil double exp. |
- 114 98 88 15 15 |
- 120 93 96 35 17 |
+ |overbooking factor | p / l * 100 %| 12 %| 27 % |
+ |
+ As the schedule for the next period is already done, we try to handle |
+ the large number of experiments as well as possible. But for the next |
+ cycle (Sept-Dec 2007) we want to agree about a scheduling policy. |