Lines 21-22 were replaced by lines 21-22 |
- allowed at the beginning of a beam block, i.e. when the sample can already |
- be mounted the day before. |
+ allowed at the beginning of a beam block, i.e. when the refrigerator |
+ can already be mounted on the instrument the day before. |
Line 28 was replaced by lines 28-53 |
- may occur after a sample change. |
+ may occur after a sample change. |
+ |
+ ''Dilution Scheduling Policy'' |
+ |
+ Since we have 2 dilution sticks, the number of experiments with this type |
+ of equipment has raised severely. |
+ |
+ ||Period ||SINQ beam days||Dil Expt.||Dil Days||DD||Points||Overbooking |
+ |Aug-Dez 2006|98 |15 |88 |15 |133 | 12 % |
+ |Apr-Aug 2007|93 |17 |96 |35 |147 | 26 % |
+ |
+ |Period | | Aug-Dez 2006 | Apr-Aug 2007 |
+ |SINQ beam days |s| 95 | 93 |
+ |number of dilution expts. |n| 15 | 17 |
+ |total dilution usage [[days] |d| 88 | 96 |
+ |dil1 & dil2 running simultaously [[days]| | 15 | 35 |
+ |points used/planned | p = n * 3 + d | 133 | 147 |
+ |points limit | l = s * 1.25 | 119 | 116 |
+ |overbooking | o = (p / l - 1) * 100 %| 12 %| 27 % |
+ |
+ Legend: |
+ \\DD Days with both sticks running simultaeously |
+ \\Points |
+ days beamdays dil double exp. |
+ 114 98 88 15 15 |
+ 120 93 96 35 17 |