| Line 7 was replaced by line 7 |
| - minimize beam time losses, some rules have to be established: |
| + minimize beam time losses, some rules have been established: |
| Removed line 10 |
| - * The experiments must start on a working day, early in the morning. |
| Lines 14-25 were replaced by lines 13-16 |
| - * Sample changes must be planned on working days |
| - * Experiments should whenever possible not start on Fridays or at a day |
| - before a holiday. If a beam block begins at such a day, the mounting and |
| - cooldown of the dilution refrigerator should be planned for the day before. |
| - * Dilution experiments should whenever possible start at the beginning of |
| - a beam block. However, several succesive experiments with the same |
| - cryomagnet/cryostat combination are also desirable. |
| - * The sample must in general be ready (put on/into a suitable holder) in the |
| - morning of a workday before starting the experiment, except when the stick |
| - is already used immediately before. Please contact the sample environment |
| - staff before booking the travel in order to agree about the latest time |
| - possible for putting the sample into the dilution stick. |
| + * Sample changes must be done on working days |
| + * The sample must in general be ready (put on/into a suitable holder) |
| + in the morning of a workday before starting |
| + the experiment, except when the stick is already used immediately before. |
| Lines 28-30 were replaced by lines 19-22 |
| - * The number of dilution refrigerator experiments is limited. Experiments |
| - during internal beam time have to be approved by Joël Mesot (scientific |
| - relevance for LNS) and by Markus Zolliker (availability). |
| + |
| + See also [Scheduling Policy for Superconducting Magnets and Dilution Refrigerators|MagnetDilutionSchedulingPolicy] (intended mainly for |
| + instrument responsibles) |
| + |