Line 1 was replaced by line 1 |
- !Draft: Rules concerning Superconducting Magnets and Dilution Refrigerator Experiments |
+ !Rules concerning Superconducting Magnets and Dilution Refrigerator Experiments |
Line 7 was replaced by line 7 |
- minimize beam time losses, some rules have to be established: |
+ minimize beam time losses, some rules have been established: |
Removed line 10 |
- * The experiments must start on a working day, early in the morning. |
Lines 14-19 were replaced by lines 13-16 |
- * Sample changes must be planned on working days |
- * Experiments should not start on Fridays or at a day before a holiday. |
- If a beam block begins at such a day, the mounting and cooldown of the |
- dilution refrigerator should be planned for the day before. |
- * The sample must be ready a workday before starting the experiment, except |
- for the case where the stick is already used immediately before. |
+ * Sample changes must be done on working days |
+ * The sample must in general be ready (put on/into a suitable holder) |
+ in the morning of a workday before starting |
+ the experiment, except when the stick is already used immediately before. |
Lines 22-24 were replaced by lines 19-22 |
- * The number of dilution refrigerator experiments is limited. Experiments |
- during internal beam time have to be approved by Joël Mesot (scientific |
- relevance for LNS) and by Markus Zolliker (availability). |
+ |
+ See also [Scheduling Policy for Superconducting Magnets and Dilution Refrigerators|MagnetDilutionSchedulingPolicy] (intended mainly for |
+ instrument responsibles) |
+ |