| Line 1 was replaced by line 1 |
| - !Draft: Rules concerning Superconducting Magnets and Dilution Refrigerator Experiments |
| + !Rules concerning Superconducting Magnets and Dilution Refrigerator Experiments |
| Line 7 was replaced by line 7 |
| - minimize beam time losses, some rules have to be established: |
| + minimize beam time losses, some rules have been established: |
| Removed line 10 |
| - * The experiments must start on a working day, early in the morning. |
| Lines 14-19 were replaced by lines 13-16 |
| - * Sample changes must be planned on working days |
| - * Experiments should not start on Fridays or at a day before a holiday. |
| - If a beam block begins at such a day, the mounting and cooldown of the |
| - dilution refrigerator should be planned for the day before. |
| - * The sample must be ready a workday before starting the experiment, except |
| - for the case where the stick is already used immediately before. |
| + * Sample changes must be done on working days |
| + * The sample must in general be ready (put on/into a suitable holder) |
| + in the morning of a workday before starting |
| + the experiment, except when the stick is already used immediately before. |
| Lines 22-24 were replaced by lines 19-22 |
| - * The number of dilution refrigerator experiments is limited. Experiments |
| - during internal beam time have to be approved by Joël Mesot (scientific |
| - relevance for LNS) and by Markus Zolliker (availability). |
| + |
| + See also [Scheduling Policy for Superconducting Magnets and Dilution Refrigerators|MagnetDilutionSchedulingPolicy] (intended mainly for |
| + instrument responsibles) |
| + |