Removed lines 39-54 |
- |
- The following table shows the situation for the last and for the next cycle. |
- With such a high number of experiments, it is unavoidable to have periods, |
- where 2 dilution refrigerators run at the same time. This is a highly |
- undesirable situation. |
- |
- |Period | Aug-Dez 2006 |Apr-Aug 2007 |
- |number of dilution expts. |15 |17 |
- |SINQ beam days |95 |93 |
- |total dilution usage [[days] |88 |96 |
- |dil1 & dil2 running simultanously [[days] |15 |35 |
- |
- As the schedule for the next period is already done, we try to handle |
- the large number of experiments as well as possible. But for the next |
- cycle (Sept-Dec 2007) we want to agree about a scheduling policy. This |
- should ideally be done before the proposal deadline in May. |