Line 37 was replaced by line 37 |
- number of experiments should not exceed 125 % of the available SINQ |
+ number of experiments should not exceed 120 % of the available SINQ |
At line 39 added 5 lines. |
+ The following table shows the situation for the last and for the next cycle. |
+ With such a hight number of experiments, it is unavoidable to have periods, |
+ where 2 dilution refrigerators run at the same time. This is an highly |
+ undesirable situation. |
+ |
Lines 46-47 were replaced by lines 51-52 |
- |points limit | l = s * 1.25 |119 |116 |
- |overbooking factor | p / l * 100 %|112 %|127 % |
+ |points limit | l = s * 1.20 |114 |111.6 |
+ |overbooking factor | p / l * 100 %|117 %|132 % |
Line 51 was replaced by lines 56-57 |
- cycle (Sept-Dec 2007) we want to agree about a scheduling policy. |
+ cycle (Sept-Dec 2007) we want to agree about a scheduling policy. This |
+ should ideally be done before the proposal deadline in May. |