| Line 37 was replaced by line 37 |
| - number of experiments should not exceed 125 % of the available SINQ |
| + number of experiments should not exceed 120 % of the available SINQ |
| At line 39 added 5 lines. |
| + The following table shows the situation for the last and for the next cycle. |
| + With such a hight number of experiments, it is unavoidable to have periods, |
| + where 2 dilution refrigerators run at the same time. This is an highly |
| + undesirable situation. |
| + |
| Lines 46-47 were replaced by lines 51-52 |
| - |points limit | l = s * 1.25 |119 |116 |
| - |overbooking factor | p / l * 100 %|112 %|127 % |
| + |points limit | l = s * 1.20 |114 |111.6 |
| + |overbooking factor | p / l * 100 %|117 %|132 % |
| Line 51 was replaced by lines 56-57 |
| - cycle (Sept-Dec 2007) we want to agree about a scheduling policy. |
| + cycle (Sept-Dec 2007) we want to agree about a scheduling policy. This |
| + should ideally be done before the proposal deadline in May. |