| Line 12 was replaced by lines 12-13 |
| - The furnace is back from repair at ''AS Scientific Products Ltd''. |
| + The furnace is back from repair at ''AS Scientific Products Ltd'' and |
| + operational. |
| Lines 14-15 were replaced by lines 15-16 |
| - replacement of the heater element. However, a repair will take |
| - a lot of time. |
| + replacement of the heater element. But even with this new design, |
| + a repair will take a lot of time. |