Line 1 was replaced by line 1 |
- !Tantalum Furnace |
+ !!Tantalum Furnace |
Line 6 was replaced by line 6 |
- !Current Issues |
+ !Heater power table |
Lines 8-11 were replaced by lines 8-20 |
- The material of the heater element and the radiation shield will be exchanged |
- by niobium. The reason is, that niobium seems to have some better properties, |
- and that the furnace [FI] uses also niobium and therefore the purchase of |
- materials will be easier. ''Anyhow, the furnace is operational''. |
+ ||T\\[[K] ||heater power\\[[W]||U(prim)\\[[V]||I(prim)\\[[A]||I(2nd)\\[[A]||T(wall)\\[[K]||cooling rate\\[[K/min] |
+ |1400|2730|152|17.8|4 x 70.4|350 | |
+ |1300|2060|130|15.8|4 x 57 |330 | |
+ |1200|1500|110|14.1|4 x 46 |320 | |
+ |1100|1050| 88|12.5|4 x 37.5|310 | |
+ |1000| 730| 70|10.8|4 x 29.8|303 | > 50 |
+ | 900| 480| 58| 9.0|4 x 23.3|298 | 50 |
+ | 800| 325| 50| 7.5|4 x 18.0|293 | 30 |
+ | 700| 195| | | |291 | 17 |
+ | 600| 120| | | |290 | 10 |
+ | 500| 74| | | |289 | 4 |
+ | 450| 53| | | |289 | 3 |
+ | 400| 38| | |4 x 4.7|289 |1.5 |
At line 12 added 5 lines. |
+ Temperature of the connections at 1400 K: 90-100 deg Celsius |
+ |
+ __The furnace must not be vented above 373 K.__ |
+ Cool down from 1400 K takes about 90 min, from 500 K still 60 min! |
+ |
At line 13 added 9 lines. |
+ |
+ [TantalumFurnace.png] |
+ |
+ ''Sketch of tantalum furnace (not to scale)'' |
+ |
+ |
+ Connection of Furnace: |
+ |
+ [FT_conn1.png] [FTconn2.png] |