Diff: CondenseMixtureDIL

Search SINQ Wiki:
SINQ LIN

SINQ Wiki
- Main Page
- Search SINQ Wiki
- Sample Environment
- Probenumg. Intern
- Troubleshooting SICS

This Page
- Page Info
- Printer Friendly

Referenced by
DIL1
DIL2

Wiki Info
- Unused pages
- Undefined pages
- RecentChanges
- Page Index
- System Info
- JSPWiki Docu
- SandBox
- OneMinuteWiki
- Create a New Page




JSPWiki v2.0.52


Difference between version 19 and version 18:
Lines 27-30 were replaced by lines 27-29
- * Open a little valve 12A (4.0 % to start).
- * While the pressure reading on G1 should always be below about 400 mbar,
- Valve 12A can be opened gradually, and opened completely, when the
- reading on G2 drops below 350 mbar.
+ * Open V12A a little (4 %) to allow the mixture pass the trap slowly.
+ * When the pressure reading on G1 stabilizes or decreases, open valve 12A
+ completely.
Lines 42-43 were replaced by line 41
- and close valve 14 again, but make sure that the pressure on G1 does
- not increase above 350 mbar.
+ and close valve 14 again. Do that several times.
Line 45 was replaced by line 43
- raise above 50 mbar. Leave the valve open until the P1 drops below 1.
+ raise above 50 mbar. Leave the valve open until P1 drops below 1.

Back to CondenseMixtureDIL, or to the Page History.